Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β
WSDOT announced multiple highway construction and closure projects beginning this weekβWSDOT statewide highway construction and road closure updates β 8/9/2026:β
- β
The longest project starts Monday, Aug. 10No usable supporting receipt β unverified.
- β
Nightly traffic alternation on US 2 will occur from Northeast 194th Place to east of Northeast 182nd Streetβ002: Nightly from 9 p.m. to 5 a.m. the next day (except Friday, Saturday and Sunday) beginning Monday, Aug. 10 to 5 a.m. Thursday, Aug. 27, US 2 traffic will alternate with flaggers from Northeast 194th Place (milepost 41) to east of Northeast 182nd Street (milepost 42) for utilities work.β
- β
The traffic alternation on US 2 will continue until Aug. 27No usable supporting receipt β unverified.
- β
A separate US 2 lane closure will occur nightly from Aug. 9 to 13β002: Nightly from 9 p.m. to 5 a.m. the next day beginning Sunday, Aug. 9 to 5 a.m. Thursday, Aug. 13, the center lane of both directions of US 2 from State Route 203/Lewis Street/Chain Lake Road to Old Owen Road/Main Street (milepost 15) will close for utilities work.β
- β
The lane closure will be on the center lane of both directionsNo usable supporting receipt β unverified.
- β
The lane closure will be between State Route 203 and Old Owen Roadβ002: Nightly from 9 p.m. to 5 a.m. the next day beginning Sunday, Aug. 9 to 5 a.m. Thursday, Aug. 13, the center lane of both directions of US 2 from State Route 203/Lewis Street/Chain Lake Road to Old Owen Road/Main Street (milepost 15) will close for utilities work.β
- β
SR 161 will be fully closed from 10 p.m. Friday, Aug. 7β161: From 10 p.m. Friday, Aug. 7, to 5 a.m. Monday, Aug. 17, all lanes of SR 161 will close between 28th Avenue South and Military Road South for installation of two fish-passable culverts.β
- β
SR 161 will be fully closed to 5 a.m. Monday, Aug. 17No usable supporting receipt β unverified.
- β
The closure of SR 161 will be between 28th Avenue South and Military Road Southβ161: From 10 p.m. Friday, Aug. 7, to 5 a.m. Monday, Aug. 17, all lanes of SR 161 will close between 28th Avenue South and Military Road South for installation of two fish-passable culverts.β
- β
The closure of SR 160 is for fish-passable culvert installationNo usable supporting receipt β unverified.
- β
A westbound US 2 off-ramp closure near Cashmere will occur on Aug. 11-12β002: Travelers on westbound US 2 near Cashmere will encounter closed off-ramps at milepost 105, also known as the Don Senn Memorial Interchange near the Big Y, on Aug. 11 from 9 p.m. to 5 a.m. on Aug. 12. Crews will be grinding the asphalt on the ramp. Traffic will be detoured to Saunders Road and Jeske Road.β
- β
A single-lane reduction on SR 202 will occur from Aug. 10-14β202: From 9 p.m. to 5 a.m. nightly Monday, Aug. 10, through Friday morning, Aug. 14, and again from Monday, Aug. 17, to Wednesday Aug. 19, portions of SR 202 will reduce to one lane between Woodinville and Redmond for crack sealing and pavement repair.β
- β
A single-lane reduction on SR 202 will occur again from Aug. 17-19β202: From 9 p.m. to 5 a.m. nightly Monday, Aug. 10, through Friday morning, Aug. 14, and again from Monday, Aug. 17, to Wednesday Aug. 19, portions of SR 202 will reduce to one lane between Woodinville and Redmond for crack sealing and pavement repair.β
- β
The single-lane reduction on SR 202 is for pavement repairsβ202: From 9 p.m. to 5 a.m. nightly Monday, Aug. 10, through Friday morning, Aug. 14, and again from Monday, Aug. 17, to Wednesday Aug. 19, portions of SR 202 will reduce to one lane between Woodinville and Redmond for crack sealing and pavement repair.β